Know what it will cost
before you go to tender.
Upload your drawings – planning stage or a full tender pack. Build Quote measures them and prices the project the way a good local builder would, at the going rates for the site's address. You choose the finish level: low, mid, high or prime. With the budget comes a draft schedule of works, written from your drawings and set out the way you write yours.
Usually back within 2 hours. Every assumption is listed.
Download a sample take-off workbook (Excel) – A real job, with the address and the names taken out.
Budget estimate · High-end finish · Inner London
£412,000
| Preliminaries and site set-up | £46,500 |
| Structure and envelope | £148,200 |
| Fit-out, kitchens and bathrooms | £121,400 |
| Комуникации (ток, вода, газ) | £58,400 |
| Contingency 10% | £37,500 |
| Items the client supplies – allowance, shown separately | £38,000 |
Example layout only – the figures are made up to show what the page looks like.
Your schedule of works, written for you
Every estimate comes with the tender documents drafted – ready for you to check, finish and issue.
Draft schedule of works
The work on your drawings written out section by section, as instructions to the contractor. No prices. In Word – yours to edit and issue under your own name.
What the drawings do not show
Who supplies the kitchen? Which floor finish? Is the boiler big enough? Every gap is listed with a suggested answer – decide them before tender, not on site.
Set out the way you write
Upload a schedule of works or a specification you have issued before. We follow your layout, numbering and wording on every job.
A pricing document for your builders
The same lines with empty rate and amount columns. Every tender comes back in the same layout, so the prices can be compared line by line.
Как работи
-
Upload the drawings
Planning drawings, Building Regulations drawings or a whole tender pack. Files, a folder, or a download link.
-
Choose the finish level
Low, mid, high or prime – or all four side by side. The site address sets the rates: central London is not priced like a market town.
-
Receive the budget – and the schedule of works
One most-likely figure with a range, cost per m² and a breakdown by element. With it, a draft schedule of works in Word and a blank pricing document to send to builders.
Four finish levels
- Low
Standard, value-led finishes. Contract kitchens, standard sanitaryware, laminate or carpet, uPVC windows.
- Mid
Good quality, mainstream brands. Fitted kitchens, engineered floors, aluminium doors, tiled bathrooms.
- High
Premium finishes. Bespoke joinery, stone, underfloor heating, high-specification glazing.
- Prime
Bespoke throughout. Natural stone, specialist plaster and joinery, designer kitchens and bathrooms, home automation.
The level only sets what the drawings leave open. Anything your drawings or specification fix is priced as drawn.
Какво получавате
- Quantities measured from your drawings, element by element
- Rates for the site's own area, anywhere in the UK – checked against the address
- A typical builder's preliminaries, overheads and profit included – so the figure is what a tender is likely to come back at
- A take-off workbook in Excel: every quantity with its dimensions and the drawing it came from, rooms with their flat and sloping ceilings, a schedule of windows and external doors, sockets and lights room by room
- A draft schedule of works written from your drawings – in Word, for you to check, finish and issue under your own name
- A list of what the drawings do not show, each point with a suggested answer – decide them before tender, not on site
- A blank pricing document for your tenderers, so every builder's price comes back in the same layout
- Upload a past schedule or specification once and we set yours out the same way
- At planning stage: construction and insulation assumed to current Building Regulations, structure assumed and listed
- A range around the figure and contingency as its own line. Construction cost only – add an allowance for fees if you want one
- You say who supplies what – kitchen, tiles, windows and the rest. Client-supplied items are priced for fitting only and listed on their own sheet
- Run it again when the drawings move on: planning, Building Regulations, tender
What it is – and isn't
An indicative budget estimate from a pricing assistant. It gives you a well-founded starting figure in hours instead of weeks. It is not a quantity surveyor's cost plan and not a builder's quotation, and it should be described as indicative. The only firm price is a builder's quotation.
Колко струва
£49 per budget estimate from your drawings – first 3 free. No subscription.